Loading Events

The culmination of 7 years of effort and one heck of a fundraising event – let’s build the bridges needed to open the Malabar and Palm Bay Trail System and GFT Connector Trail. We will be cancelling all other Trail Maintenance and Improvement Days that month to focus on this monumental build event. With this weekend usually dedicated to the Santos Fat Tire Festival, which was sadly cancelled this year, we thought what a better way to spend it than to give back in a huge way to our local trail system.

Go to Top